SURVIVAL THROUGH QUALITY
PRODUCT CENTER
-
Pulse dust collector
-
Mine dust collector
-
Boiler dust collector
-
Metallurgical dust collector
-
Carbon plant dust collector
-
Chemical dust collector
-
Rubber dust collector
-
Woodworking dust collector
-
Single machine dust collector
-
Static electricity Dust collector
-
Cyclone dust collector
-
Wet dust collector
-
Filter cartridge dust collector
-
Insert valve (gate valve)
-
Ventilation butterfly valve (cold air valve)
-
Spiral conveyor (auger)
-
Scraper conveyor
-
Dust humidifier
-
Bucket elevator
-
Ash discharge valve
-
Material Handling Equipment
-
Wet scrubber
-
Dust collector
-
Dust removal filter bag
-
Dust removal bag cage
-
Polishing platform
-
Waste gas treatment equipment
-
Electric control cabinet
-
Fan
-
Smoke welding machine
-
Liquid level switch
-
Dust removal filter element
-
Aeration cushion
-
Sweeper
-
Dust suppression device
-
Solenoid valve
Bulk machine
A bulk machine is a type of packaging equipment, and commonly used bulk machines include clinker bulk machines, bottom bulk machines, and side bulk machines.
The clinker bulk machine is an equipment that automatically transports clinker (≤ 50mm) from the warehouse to the clinker bulk truck ship. The bulk equipment for cement clinker at the bottom of the warehouse mainly consists of manual rod valves, electric fan-shaped valves, winding devices, telescopic discharge devices, dust collection hoses, capacitive limit switches, electrical control systems, and other parts.
After the transportation tool enters the position, open the corresponding number of rod valves. Press and hold the "lowering button" on the control cabinet, and once the feeding head is in place, the power supply of the lifting motor will be automatically disconnected. Press the "loading button" to enter the unloading state, and the auxiliary equipment will start working accordingly. The dust generated during unloading will be purified by the dust collector through the feeding hopper and the telescopic dust collection hose. When the material in the feeding head is full, the feeding head will raise and alarm at the same time, and the lifting distance should be set before loading. If the rise distance is 1 meter, adjust the time relay to T=1/V. During the rising process, loading is always carried out. When the material head is full, repeat the above action. After reaching the full position, press the stop button to reverse brake the electric vibration machine, or close the fan-shaped valve to stop feeding, and other equipment will stop working accordingly. After parking, you can press the up button to make the unloading hopper leave the material at a certain distance, ensuring the movement of the transportation tool, and then align it with the second unloading station. Until the entire silo is filled.